BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv5.8.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.bnmit.org
X-WR-CALDESC:Events for 
BEGIN:VTIMEZONE
TZID:UTC
BEGIN:STANDARD
TZOFFSETFROM:+0000
TZOFFSETTO:+0000
TZNAME:UTC
DTSTART:20180101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20181113
DTEND;VALUE=DATE:20181114
DTSTAMP:20260520T030453
CREATED:20210726T064346Z
LAST-MODIFIED:20210803T043148Z
UID:15836-1542067200-1542153599@www.bnmit.org
SUMMARY:INDUSTRY VISIT PHOTO GALLERY
DESCRIPTION:     This post was last updated on         August 3rd\, 2021An Industrial visit to Solar Power Park at Pavagada was organized on 13th November 2018 for 7th semester\, EEE students. The capacity of solar power park is 20MW with an area encroaching to around 40acres. The visit helped the students to gain valuable insight on the working and operation of solar power plant.
URL:https://www.bnmit.org/event/industry-visit-photo-gallery-2/
CATEGORIES:Department of EEE,Home
ATTACH;FMTTYPE=image/jpeg:https://www.bnmit.org/wp-content/uploads/2021/07/bnmit_post_4h-150x150-36.jpg
END:VEVENT
END:VCALENDAR